145 results found
(0.222s)
25 May 2017
A Traffic and Road Safety Impact Report, including consideration of traffic flows to...and within the on-site car park, is required with all applications involving new child...care centres...
25 May 2017
A Traffic and Road Safety Impact Report, including consideration of traffic flows to...and within the on-site car park, is required with all applications involving new child...care centres...
30 May 2017
Road Safety Audit (RSA) undertaken.... Vertical design completed....August 2015... Linemarking and signing drawings completed for Main Roads WA approval.... Horizontal design...
28 Mar 2017
• Road Safety Audit (RSA) undertaken....• Vertical design completed....August 2015...• Linemarking and signing drawings completed for Main Roads WA approval....• Horizontal design...
22 Sep 2017
• Traffic and Road Safety Impact Report...• Acoustic Report...5.8. ...Public consultation:...a. ...Applications for new child care premises or the expansion in capacity of existing...child...
22 Sep 2017
• Traffic and Road Safety Impact Report...• Acoustic Report...5.8. ...Public consultation:...a. ...Applications for new child care premises or the expansion in capacity of existing...child...
22 Sep 2017
• Traffic and Road Safety Impact Report...• Acoustic Report...5.8. ...Public consultation:...a. ...Applications for new child care premises or the expansion in capacity of existing...child...
30 Jan 2017
• Road Safety Audit (RSA) undertaken....• Vertical design completed....August 2015...• Linemarking and signing drawings completed for Main Roads WA approval....• Horizontal design...
27 Sep 2017
and post road safety audit...review, identifying any...corrective actions required...Unlikely Medium Moderate Undertake road...safety audits...before...commencement...(status...
27 Jul 2017
• Road Safety Audit undertaken....• Vertical design 50% complete....January 2015...• Vertical design 25% complete....December 2014...• Linemarking and signing drawings completed for Main...