24 results found
(0.185s)
At its meeting on 21 December 1992, Council requested that a report be submitted to Community Services Committee on the cost and feasibility of improving the air conditioning of the...
2 Joondalup Administration Building: Computer Room air conditioning; ...3 Kingsley Administration Building: Air conditioning; ...4 Wanneroo Library: Air...
19 Sep 2000
H40218 Air Conditioning Unit - Aerobics Room Aquamotion...- [690-12] 18...H40219 Guidelines for Independent Creche Operators in City...of Wanneroo - [330-0-1] 18...H40220 Establishment of...
Each contractor was asked if he was prepared to maintain either the current rates in the specified schedule of items for electrical, hydraulics, glazing, graffiti and fire equipment or maintain the...
19 Sep 2000
1 Joondalup Administration Building: Air conditioning;...2 Joondalup Administration Building: Computer Room air...conditioning;...3 Kingsley Administration Building:...
The first of the two major areas of difficulty was problems with truck air conditioning systems during the hot weather. This is being addressed with proposed changes to the engine...
The demand for power and air conditioning in respect of the new DX range has been determined to be half of that of the existing generation of processors. It is suggested that part of...
19 Sep 2000
emergency exits, air-operated doors, suspension, air conditioning...REPORT NO: Page No: 22...and shelving. ...Design lessons based on experiences such as these...are valuable in...
19 Sep 2000
cleaning, air conditioning and fire equipment attendance...services....The City Engineer advises that all contractors offered the...twelve month extension of initial contract agreed to...
19 Sep 2000
condition of support consequently requested that this...portion of the subdivision be deleted from the...application area pending further investigation....46 Further discussion is also required in...