430 results found
(0.604s)
29 Oct 2018
In the absence of any other individual arrangement with the building management or waste management staff,...residents and tenants (and their contractors) would be responsible for the...
31 Jul 2012
environmentally sustainable design principles into building design in the community....to encourage the integration of environmentally sustainable design principles into the...construction and...
05 Aug 2022
Building Services, Waste Services, Health Services, Engineering and Landscaping...departments....The comments from these departments have been incorporated into the planning...assessment...
23 Oct 2015
On collection days rear-lift vehicles for general waste and recycling will enter the building from...Tassels Place. ...The vehicles will drive in a forwards motion and reverse into the...
14 Jul 2015
• e-waste (electronic waste) this...can now be recycled for free at...Tamala Park, Balcatta Transfer...Station, or at one of the City’s...E-waste drop off days to be...held...
04 Jun 2013
environmentally sustainable design principles into building design in the community....to encourage the integration of environmentally sustainable design principles into the...construction and...
30 Apr 2019
Waste collection, delivery and other service vehicle activity for the new KCC building will be...accommodated within the site in the new loading area accessed from the existing Right of Way
07 Jul 2020
Recycled Building Waste 8%...General Waste 1.95%...Asbestos containing material 0.05%...Total 100%... These works are assumed to be completed and signed off by a contaminated sites...
01 Nov 2012
environmentally sustainable design principles into building design in the community....to encourage the integration of environmentally sustainable design principles into the...construction and...
08 Dec 2020
Prior to issue of a Building Permit, a Waste Management Plan shall be submitted...to and approved by the City prior to commencement of site works. ...Waste collection...shall be...